Express
Dash Will Activate Spork 21 on November 17th
Summary: Dash today announced that the network has reached sufficient masternode adoption, so it plans to activate Spork 21 on November 17th. The proposal mainly focuses on the connection and detection between LLMQ members of DASH network (to determine the status of nodes) to improve the overall network performance. The network is expecting the BIP9-style hard ...
Dash today announced that the network has reached sufficient masternode adoption, so it plans to activate Spork 21 on November 17th.
The proposal mainly focuses on the connection and detection between LLMQ members of DASH network (to determine the status of nodes) to improve the overall network performance. The network is expecting the BIP9-style hard fork to lock-in at block height 1370880 (November 13th) or the end of the next window at height 1374912 (November 20th).
It plans to release a minor version of Dash Core v0.16.1 on November 13th. This version has a Bug fix for the previous version of v0.16.0.1. Masternodes may see a small benefit in network usage by upgrading to v0.16.1. Miners do not need to upgrade to v0.16.1.
By Amy Liu
Tags: DASH,Node,Spork 21,upgrade
Link: Dash Will Activate Spork 21 on November 17th [Copy]