Express

Dash Will Activate Spork 21 on November 17th

Amy Liu

Summary: Dash today announced that the network has reached sufficient masternode adoption, so it plans to activate Spork 21 on November 17th.  The proposal mainly focuses on the connection and detection between LLMQ members of DASH network (to determine the status of nodes) to improve the overall network performance. The network is expecting the BIP9-style hard ...

Dash today announced that the network has reached sufficient masternode adoption, so it plans to activate Spork 21 on November 17th. 

The proposal mainly focuses on the connection and detection between LLMQ members of DASH network (to determine the status of nodes) to improve the overall network performance. The network is expecting the BIP9-style hard fork to lock-in at block height 1370880 (November 13th) or the end of the next window at height 1374912 (November 20th).

It plans to release a minor version of Dash Core v0.16.1 on November 13th. This version has a Bug fix for the previous version of v0.16.0.1. Masternodes may see a small benefit in network usage by upgrading to v0.16.1. Miners do not need to upgrade to v0.16.1.

By Amy Liu

Last Update:

Tags: ,,,
Link: Dash Will Activate Spork 21 on November 17th   [Copy]
  • The Crypto IPO Wave: From Fringe to Front Page 2 days ago
  • Bitcoin's Next Wave: Infrastructure, Institutional Growth & On-Chain Art – Twitter... 2 days ago
  • Cloud Mining, Global Scale: How BitFuFu Is Powering the Next Phase of Bitcoin Adoption 4 days ago
  • “Building Bitcoin DeFi” — Bitpush Talks to Bitlayer’s Charlie Hu at Bitcoin 2025 Las Vegas 15 days ago
  • Empowering Women Through Bitcoin: Alejandra Guajardo’s Mission Beyond the Pageant Stage 16 days ago
  • You need to login to comment.